Midlands & UK-wide · enquiries answered fast Call 07346 029623
Home / Services / Stitch drilling
Service · 08 of 08

Stitch
drilling.

A row of overlapping diamond cores that together form a cut — for openings where wall and floor saws can't reach. Thick or heavily reinforced sections, restricted access, curved openings, vibration-sensitive buildings. Scan-led, low-vibration, broken out clean.

Stitch holes
50 – 250mm Ø
Overlap
20 – 40mm
Openings
Rectangular · curved
Three drilled holes in a concrete slab with extracted cores stood alongside
Where saws can't reach
Representative work · photography on site

Want the long version? Read the full stitch-drilling guide.

What stitch drilling is

Stitch drilling is a line of overlapping core holes that, taken together, form a cut — think of perforating a sheet of paper to tear it cleanly, in concrete. The crew sets a stand-mounted core rig over the marked-out line, drills the first core, moves the rig the agreed pitch and drills the next, each core overlapping the last by 20 – 40mm. When the line is complete, the stitched section is broken out and the opening is dressed.

It's slower than sawing — the only reason to choose it is when sawing isn't possible. When that's the case, stitching is usually the cleanest, lowest-risk option there is: no percussive impact, no shock to the surrounding structure, and every hole plotted around what the scan found.

When stitch drilling is the right call

Who it helps

Main contractors planning structural alterations on live or occupied buildings. Demolition contractors needing controlled section removal on a sequenced project. M&E contractors cutting plant openings in heavily reinforced or post-tensioned slabs. Refurbishment and heritage teams working on brittle substrates and sensitive finishes where percussive breaking is off the table. If the opening is awkward enough that you're not sure who to call, this is the page — or see specialist works for the wider capability.

What to send for a fast quote

Not sure whether stitch drilling is the right method or whether a saw will do? Send the brief and we'll come back with the right approach — and a realistic time on the quote, not an optimistic one. A typical 1m × 1m opening through a 600mm slab runs half to a full crew-day depending on substrate, rebar density and access.

Safety, dust and clean-work notes

Slurry is contained the same way as any wet diamond drilling — vacuumed, captured and bagged out, with the slab handed back clean. Dry with M-class HEPA extraction where wet isn't an option. Scanning is done before the rig is set on any slab where reinforcement, services or post-tension matter, and RAMS, COSHH and permits are issued before the crew mobilises. Break-out of the stitched section is planned with the structural constraints in mind — sometimes lifted, sometimes light percussion on the remaining ligaments only.

Related services

Use cases

Where stitch drilling fits.

800 – 1000mm+
Thick sections

Walls and slabs beyond wall-saw depth, stitched from one side.

Doors · plant
Reinforced openings

Door and plant openings in heavily reinforced slabs and walls.

No saw rail
Restricted access

Plant rooms, basements, listed buildings — rigs re-assemble in tight spaces.

Low-vibration
Sensitive sites

Occupied buildings, hospitals, listed structures, PT slabs.

Process

From marked line to clean opening.

01
Brief in

Opening size, thickness, access, postcode.

02
Scan

GPR or ferrodetector — every hole plotted around what's there.

03
RAMS

Permit-ready RAMS, COSHH, break-out plan.

04
Stitch

Overlapping cores at the agreed pitch, wet and contained.

05
Break out

Section removed, edges dressed, slab handed back clean.

FAQ

Stitch drilling questions.

What is stitch drilling?
Overlapping diamond cores drilled in a tight line to remove a rectangular or curved section of concrete where saws can't reach — typical for door openings in heavily reinforced slabs, plant openings, and structural alterations on live or occupied buildings.
When is stitch drilling the right method?
When sawing isn't possible — the section is thicker than a saw can cut, the access is too tight for a saw rail, the cut has to dodge live services or PT cables, or the opening is curved. It's slower than sawing, so we only recommend it when it's the right tool.
How long does stitch drilling take?
A typical 1m × 1m opening through a 600mm slab runs half to a full crew-day, depending on substrate, rebar density and access. The quote gives you a realistic time, not an optimistic one, so you can sequence the programme around it.

Got an opening to cut?

Send the opening size, thickness and a photo of the access — we'll come back with the right method and a price.

Same-day quotes when possible
Saw can't reach it? Send the drawing.