Specialist
works.
Stitch drilling, controlled concrete removal, structural openings and restricted-access work where standard rigs can't go. Scaffold-mounted drills, working at height and permit-controlled access coordinated where required.

What "specialist works" actually covers
Specialist works is the catch-all for the jobs that don't fit a standard core or floor-saw method statement — stitch drilling for a structural opening in a heavily reinforced slab, controlled concrete removal on a live floor above a trading retail unit, scaffold-mounted drilling on the side of a high-rise, restricted-access coring in a basement plant room or behind a riser cupboard. Same crews, different planning, different kit.
The work is usually defined by a constraint: there's reinforcement everywhere, access is awkward, there are services live behind the wall, the site is occupied, the slab is post-tensioned, the opening has to come out clean for structural reasons, or the rig has to mount on scaffold rather than a floor. Whatever the constraint, the job starts with a site visit or a detailed brief, and the method follows from that.
Typical use cases
- Stitch drilling — overlapping 50 – 250mm cores in a tight line, taking out a rectangular or curved section of concrete. Used for door openings, plant openings and structural alterations where wall saws can't get close enough. Dedicated stitch drilling page here.
- Controlled concrete removal — vibration-aware breakouts on live or occupied sites where percussive demolition is off the table.
- Restricted-access work — coring and cutting in plant rooms, basements, plenums, risers, tanks. Permit-controlled access coordinated where required.
- Working at height — scaffold-mounted rigs and MEWP work, by arrangement, subject to access and scope.
- Heritage and listed buildings — low-vibration work where the substrate is brittle, the finishes are sensitive and the spec is tight.
- Post-tensioned slab work — scan-led, marked-up cuts where the PT cables can't be touched.
Who it helps
Main contractors planning a structural alteration on a live or recently completed building. Demolition contractors needing controlled cuts on a sequenced project. M&E contractors retrofitting plant on the roof or in a basement plant room. Refurbishment teams cutting openings in heavily reinforced or post-tensioned slabs. Facilities and estates teams needing one-off interventions in occupied buildings — schools, hospitals, offices, retail.
If the job is awkward enough that you're not sure who to call, this is the page. Stitch drilling explained here.
What to send for a fast quote
- Site postcode, building type and access route.
- Photos of the area and any access constraints.
- Drawings — structural, M&E, demolition sequence — if available.
- Opening size and shape, or stitch-hole count and pattern.
- Reinforcement, post-tension and substrate notes.
- Working hours, permit windows, programme date.
- Any structural engineer's instructions, propping requirements or temporary works needed.
A site visit is often the right call before pricing — say so and we'll book one in. Quote checklist.
Safety, dust and clean-work notes
Specialist works almost always means bespoke RAMS — confined-space permits, working-at-height plans, propping coordination with the structural engineer, watch-teams for tanks and plenums, isolation plans for live services. Wet drilling is the default with slurry contained at source; dry with M-class HEPA where wet is not an option. Scanning is mandatory on any slab where reinforcement, services or post-tension matter — the picture has to be clean before the rig is set.
Related services
- Diamond drilling overview — the underlying method and substrate range.
- Stitch drilling — overlapping cores forming openings where saws can't reach.
- Core drilling — the standard coring service most stitch patterns are built from.
- Concrete cutting — saw cuts as an alternative or complement to stitch drilling.
- Service openings — when the opening is for M&E penetration.
- Rapid & out-of-hours — for the specialist jobs that can only happen on a weekend permit.
When the standard rig won't fit.
Overlapping cores for controlled section removal — slabs, beams, walls.
Vibration-aware breakouts on live and occupied sites.
Tanks, plenums, risers, basements — permit-controlled access coordinated where required.
Scaffold-mounted rigs and MEWP work, subject to scope and access.
Plan it. Permit it. Execute it.
Walk the access. Photograph constraints.
Bespoke RAMS — rigs, anchors, isolation, watch-team.
Hot work, confined space, working at height — coordinated.
Crew matched to ticket. Continuous monitoring.
Photo log, area cleared, handover to the next trade.
Specialist works questions.
What is stitch drilling?
Can you work at height?
Do you cover confined-space work?
Got an awkward one?
Send photos of the access and a couple of lines on the opening. We'll come back with a method and a price — site visit included where the scope warrants it.